Hydro-SaaS
Menu

Tenant module · demo factory · simulated data

Namanve Demo Industries

What one factory sees: three fictional effluent outlets with synthetic readings. Switch to the park operator view →

83
Compliance score
Average of 3 outlets with data
Outlets in breach
1 / 3
Act now — see below
Open alerts
8
Not yet acknowledged
Next predicted breach
~21 h
Electrical conductivity · Outlet A

Outlets

Recent alerts

  • WarningOutlet A · Metal finishing line25 Oct, 19:00

    Turbidity 46 NTU is approaching the limit (50 NTU). Check treatment.

  • WarningOutlet A · Metal finishing line25 Oct, 14:00

    Electrical conductivity 817 µS/cm is approaching the limit (1000 µS/cm). Check treatment.

  • BreachOutlet B · Battery recycling yard25 Oct, 14:00

    pH 4.6 is outside the limit (5). Stop or divert discharge and investigate.

  • BreachOutlet B · Battery recycling yard25 Oct, 10:00

    Lead 0.118 mg/L is outside the limit (0.1 mg/L). Stop or divert discharge and investigate.

  • WarningOutlet B · Battery recycling yard25 Oct, 03:00

    Chemical oxygen demand 56.5 mg/L is approaching the limit (70 mg/L). Check treatment.

  • WarningOutlet B · Battery recycling yard24 Oct, 19:00

    Chemical oxygen demand 58.6 mg/L is approaching the limit (70 mg/L). Check treatment.